Background

Saturday, September 29, 2012

Stucco trim and interior trim

 Putting on the trim around the outside on the windows.
 
 Stucco columns with the trim for the stone base.

 Corbels going in.
 
 Stucco trim around the front door.
 
 Trim on the windows.
 
 Stucco and trim going in on the back side of the house.
 
 More wood trim going in on the stairs.
 
 Shelving in the storage room.

 Kynlee looking out over the master bath cabinet.
 
 Kynlee doing to quality control test for sturdiness.
 
 Kynlee checking out the computer nook.
 
Upper and lower cabinets in the computer nook.
 

Saturday, September 22, 2012

Cabinets Going In!

 
Pantry Cabinets
 
 Master Crown Molding
 
 His Master Closet
 

Thursday, September 20, 2012

Rails, Trim And Texture Going In!

 Forming the hand rails.
 
 Forming the balcony rail.
 
 Cabinets going in the cabana bath.
 
 Built in dresser, shelves and TV housing in the closet.
 
 Hand troweled texture on the living room walls.
 
Hand troweled texture on the balconey wall.


Wednesday, September 12, 2012

Beams arrive!

 Cypress beams shipped from Louisiana

 
These are about 500 lbs each
 
 Hernia time!
 
Stacking them up in the garage.

House is coming along! Slow but sure!!

 More Stucco Going On
 
 Second Coat of Four Coats of Stucco
 
 Knotty Alder Double Door to Bath Room

 
 Slow Progress on the Stucco

 Debbie and Kynlee looking out the living room window

 Kynlee in the kitchen
 
 Kynlee dancing to the Mexican music of the trim guys
 
 Knotty Alder door to master bedroom
 
Front of House