Background

Saturday, August 25, 2012

Week 23 - Taping it all up!

 Dome nearing completion.
 
 Sheetrock getting taped up.
 
Dining room ceiling taped and floated.

 
 Family Room

Kids in the family room.

 
 Looking at entry from living room.
 

Saturday, August 11, 2012

Week 22 Sheet rock going in!

 Ceiling of Study

 Master bedroom

 Groin vault in vestibule

 Under landing

 Bedroom 3 and balcony

 This guy is on stilts on a 12" board over the stairs

 Master bath with fireplace and walk through shower

 Groin vault in the dining room

 These guys are crazy!!

 Looking down the media room

Entry way with Tiffany at the door

 Dining room groin vault all the way in

 Tiffany in front of the master bath fireplace

Game room

Breakfast nook

Debbie in the kitchen and game room upstairs

Week 21 Star Ceiling Lights Up

 Fibers cut to about 3-4 inches.


Star Ceiling lit up.  Will look even more awesome once trimmed.