Saturday, July 21, 2012

Week 18 - Insulation is in and Scratch Coat for Stucco

 
Insulation in Familyroom



Insulation in media room



Nice thick foam!



Scratch Coat going on.


 
 More scratch coat.



  
Stucco going on the front!




Wednesday, July 18, 2012

Week 17 - Insulation Goes In!!

 
 Laying down to get to the tight spots.


 Foam above the door.


 Sprays on thin and then swells up huge!!


Looks like it snowed in the family room from the foam bits falling down.

Week 16 1/2 Exterior walls prepred for stucco.

 
 Stone on the bottom and stucco on the top.


This will be all stucco, they just haven't gotten the mess on the top.

Weeks 14-15-16! Not much done. Builder on vacation!

Outdoor Fireplace getting ready for the rock!


Arched door for upstairs bedroom about to go in.

Monday, June 25, 2012

Week 13 - More wiring, stone and cementing the roof.

Stone has arrived!


Better look at the front door transom.

This is volume box (blue with white wire) for the stereo.

 
View out the master bedroom.

You can see the red mud (cement) that they use to seal the crown of the tile roof.

What it looks like from the back now.

What it looks like from the front at week 13.

 

Saturday, June 16, 2012

Week 12 Fireplaces going in!

Herringbone going into the firebox.


Fireplace in Masterbath blocked up and ready to finish!


Familyroom Fireplace with the herringbone bricks!

Firebox for outdoor kitchen going in!


Sunday, June 10, 2012

Week 11 Iron Door is in!

 Wrought Iron Door Transom.
Firebox in Fami lyroom going in.

CAT6-HDMI wire going in.

Security and speaker wire going in.