Background

Saturday, August 11, 2012

Week 22 Sheet rock going in!

 Ceiling of Study

 Master bedroom

 Groin vault in vestibule

 Under landing

 Bedroom 3 and balcony

 This guy is on stilts on a 12" board over the stairs

 Master bath with fireplace and walk through shower

 Groin vault in the dining room

 These guys are crazy!!

 Looking down the media room

Entry way with Tiffany at the door

 Dining room groin vault all the way in

 Tiffany in front of the master bath fireplace

Game room

Breakfast nook

Debbie in the kitchen and game room upstairs

Week 21 Star Ceiling Lights Up

 Fibers cut to about 3-4 inches.


Star Ceiling lit up.  Will look even more awesome once trimmed.

Saturday, July 21, 2012

Week 18 - Insulation is in and Scratch Coat for Stucco

 
Insulation in Familyroom



Insulation in media room



Nice thick foam!



Scratch Coat going on.


 
 More scratch coat.



  
Stucco going on the front!




Wednesday, July 18, 2012

Week 17 - Insulation Goes In!!

 
 Laying down to get to the tight spots.


 Foam above the door.


 Sprays on thin and then swells up huge!!


Looks like it snowed in the family room from the foam bits falling down.

Week 16 1/2 Exterior walls prepred for stucco.

 
 Stone on the bottom and stucco on the top.


This will be all stucco, they just haven't gotten the mess on the top.

Weeks 14-15-16! Not much done. Builder on vacation!

Outdoor Fireplace getting ready for the rock!


Arched door for upstairs bedroom about to go in.